Seems to me the typical three year cycle between model releases should be long enough to assure sufficient quality control to minimize, or eliminate, the need for o.s. updates and related bug fixes after introduction. Ketron has used longer than three year model cycles theoretically allowing for more and better quality control before release.
Sometimes the question is, do we want it better, or do we want it now?
_________________________
The older I get, the better I was..