Hi all.
Just posting this here because I know a few people have been following the V-Machine.
One of the guys working at SMPro Audio has just mentioned what the CPU upgrade will be like.
The CPU upgrade will be around 2.3 times the current speed of the V-Machine, we had to wait for a new CPU to be available that can conform to our specifications of Wattage (heat output) used. It will also allow us to have upto 2gig or RAM on board. I will post some test figures as soon as i have them.(real world running VST plugins).
It will be in upgrade to any existing V-Machine (old or new)
Cost around $150-175 (USD)
we will do some final testing towards the end of July with a plan to release it in Sep-Oct.
Which means for sample playback your basically looking at in around 230+ notes poly with a limiter and a reverb plugin running at the same time.
That's pretty sweet
James.
[This message has been edited by Irishacts (edited 06-19-2009).]